Renew Existing Foundation

MK5 IS THE ANSWER IF YOU ALREADY HAVE AN EXISTING FOUNDATION

The MK5 form is a Pre-Engineered foundation, not a slab. Foundation engineers will not normally put their seal on an existing foundation for a re-build, you will need to remove and replace the foundation, that cost more then starting fresh.

The MK5 Floating Floor Foundation requires a floating base, about 10" thick, compact at 4" intervals level and firmly compact.
That is exactly how we will use your existing foundation/slab, as a very hard compact level base that has nothing to do with the MK5 foundation design, Its just the base.

Engineer sealed permit drawings are issued based on the MK5 form designed for the new structure.

To Re-Use your existing slab/foundation... assemble the MK5 form on your old slab, square it, and pour.

 

Pre-Engineered and Pre-Fabricated the MK5 foundation Saves You Time and Money !  Re-Use your old foundation and SAVE.